A fragmented installer base with a concentrated top
Most certified heat pump firms are very small heating businesses, but a few large ones do a disproportionate share of grant-funded work. Among installers registered for the Boiler Upgrade Scheme (BUS), firm sizes were:
- 61% employed 2-9 people.
- 7% were sole traders.
- 26% had 10-49 staff.
- Only 5% employed more than 50.
Most also fit fossil-fuel heating, solar and other measures. For two-thirds (66%), low-carbon heating was less than half of annual income, and only 25% relied wholly on BUS for that work. The wider trade looks the same: 95% of plumbing, heating and air-conditioning installation businesses are micro-businesses, and only 0.3% of heat pump installers employ more than 100 people. The government describes the retrofit sector as some large organisations alongside a great number of micro and small firms, many still focused on conventional repair and maintenance.1,2,3
Delivery is skewed. Between May 2022 and March 2025, 20% of BUS installers delivered 84% of BUS-funded installations, and 13% of registered installers completed none. The median registered installer completed five installations. The mean was 26, pulled up by a few firms completing hundreds or, in some cases, thousands. By firm size, shares of installations were:
- Firms with 50 or more staff: 36%.
- Firms with 10-49 staff: 36%.
- Micro-firms (2-9 staff): 26%.
- Sole traders: 2%.
On these inputs, the largest firms deliver about seven times their 5% share of registered companies.4
| Period | Top 10 share of BUS applications | Top 20 | Top 30 | What it tells the reader |
|---|---|---|---|---|
| Scheme years 1-2 (May 2022 to March 2024) | - | - | around 38% | Energy & Utilities Alliance figure; the gas-industry body read it as a limited installer pool |
| Launch to March 2025, cumulative | - | - | 43.1% (32,860 applications) | 206 installers (12.9%) made a single application each |
| Scheme year 3 (April 2024 to March 2025) | 40.3% | 47.2% | 51.9% | Highest concentration recorded |
| Scheme year 4 (April 2025 to March 2026) | 36.5% | 43.8% | 48.9% | Slight easing as the market grew; installers not named |
Our calculation: 36.5% of the 45,880 applications received in scheme year 4 is about 16,750 applications, or roughly 1,675 for each top-10 firm on average. 98.6% of applications were for air source heat pumps. Applications can include re-applications for the same property, so this is a ceiling on the leading ten's grant-funded work, not a count of installations.8
Types of installer and delivery models
Energy suppliers are the newest and largest entrants:
- Newcomers by the end of the 2022-25 BUS phase included "some of the largest energy companies".
- The scheme also pushed installers to serve wider property types and areas.
- Industry experts report that suppliers, including members of the "Big Six", now offer heat pump tariffs and in some cases manufacture and install heat pumps and invest in training.
- The government notes the largest electricity suppliers competing to offer heat pump households the lowest-cost deal, many with specialist discount tariffs.
A second emerging model is the umbrella scheme, in which a contractor engages a network of subcontractors rather than employing installers directly.9,10,11
The two biggest suppliers are vertically integrated:
- Octopus Energy runs both installation and manufacture. Octopus Energy Services installs heat pumps alongside solar, batteries, EV chargers and smart meters. Octopus Energy Heating designs and manufactures heat pumps.
- British Gas operates British Gas Social Housing Ltd as an MCS-certified installer. It covers every English region plus Scotland and Wales, is registered for BUS, and is certified for air source, ground source and exhaust air heat pumps.
- British Gas is also the primary delivery contractor for Wales's Nest scheme. Nest paid it £27.5 million in 2025/26, a provisional figure covering running and installation costs.12,13,14
Below the suppliers sit specialist heat pump companies and regional renewables firms. Aira, a specialist installer, reported that after England's permitted development rules for air source heat pumps changed, the share of its customers needing a planning application fell from 30-40% to 5-10%. Heat Geek's chief executive, Aadil Qureshi, calls installers "the bedrock of this transition" and argues for more funding for high-quality training. Regional firms such as Elite Renewables work a home patch, in its case the South East.15,16,17
Social housing and the Energy Company Obligation (ECO) run through different routes:
- Tier 1 contractors are the majority of suppliers working directly with housing associations and local authorities. The government plans to move ECO's supply chain onto public schemes, partly through subcontracting.
- Under ECO, obligated energy suppliers can install themselves, contract out or trade obligations, and they choose which households and measures to fund.
- Under BUS, subcontracting is allowed only where it fully meets MCS standards, and the applying installer stays responsible for compliance.18,19,20
Who leads by volume
No public dataset names installers with their volumes, so the leaders are known only by their own claims. What is visible is that the two large energy suppliers sell at scale. In May 2024 the government noted that Octopus Energy and British Gas were both offering complete heat pump installations from £500 with BUS funding.21
| Company | Claim | Measure | Volume disclosed | What it means for a ranking |
|---|---|---|---|---|
| Octopus Energy | "the UK's largest installers of heat pumps" (FY25 annual report) | Heat pumps | About 65,000 "other low-carbon technology devices" in FY25 (heat pumps, EV chargers, solar, batteries; UK and Europe; FY24 c. 30,000) | Self-description; the device total cannot be turned into a UK heat pump count |
| Centrica (British Gas) | "the UK's largest installer of low carbon heating technologies" (chief executive Chris O'Shea, April 2025) | All low-carbon heating | None | Broader measure, not comparable with Octopus's claim |
| Kensa | About 50% of the ground source heat pump market (2023) | Ground source only | None | Manufacturer and installer, part-owned by Legal and General and Octopus; leads a niche |
Kensa's lead matters little to overall volume. Ground source heat pumps were 1.9% of the 80,098 BUS grants paid to March 2026, against 97.6% for air source. Outside these three names, the firms behind the anonymised top-10 and top-30 shares are not published.26
Market size and trend
Certified domestic retrofits grew to about 53,000 in 2025, then slowed sharply in 2026:
- 2025 was 9% above 2024 (48,857) and more than four and a half times 2020 (11,327).
- Summing the quarterly table gives 53,263 for 2025.
- January to June 2026 saw 20,895 installations, 22% fewer than the 26,768 in the same months of 2025.
- That first half was still nearly double the 10,605 of the first half of 2021.
Recent improvements to address matching and to identifying domestic properties revised the whole series slightly upward.27,28,29
Certified domestic retrofits (UK) by year
Source: What Heat Pump calculations from DESNZ Table 1.1 (13 Oct 2026)
Air-to-water heat pumps were 99% of retrofits in the first half of 2026, up from 93% in the same period of 2021.30
The official count excludes new-build homes and retrofits not certified by MCS, the Microgeneration Certification Scheme that certifies installers. Broader measures are therefore much larger:
- Climate Change Committee, 2024: 98,000 heat pumps installed, 73,000 of them in existing homes. 23,000 were installed under BUS, and around 43% of all installations were supported by government schemes.
- MCS, 2024: almost 60,000 certified installations, a 43% rise. This is above the official 48,857 because the official series counts domestic retrofits only.
- Heat Pump Association, 2025: 125,037 heat pumps sold, including 110,353 hydronic (water-based) units. Sales are not the same as installations.
Our calculation: 53,263 certified retrofits are about 48% of 2025 hydronic sales. The rest covers new build, non-certified and non-domestic work, and changes in stock.31,32,33,34,35
New build is the largest uncounted channel and is growing. Only 13% of new homes completed in 2024 had a heat pump, while 71% had a fossil fuel boiler. Octopus reports that almost one in four (24%) new homes in England are now fitted with a heat pump, and that Wales has been above 30% for the last three months. Government standards will make low-carbon heating the default in new homes.36,37,38
Size of the certified installer base
| Date | Count | Coverage | What it means |
|---|---|---|---|
| September 2024 | 1,935 | MCS-certified heat pump installation businesses, UK | Baseline before the 2024 surge |
| End of 2024 | Over 2,000 (387 newly certified in 2024) | MCS heat pump contractors, UK | Growth of about a fifth in one year's certifications |
| October 2025 | 1,801 | MCS heat pump contractors, England only | England holds the large majority |
| July 2026 | Over 2,200 | MCS-certified installation businesses, UK; nearly 30,000 people trained since 2021 | The Heat Pump Association says demand, not installer capacity, is now the main constraint |
The workforce is larger in heads than in hours. The government estimates around 10,000 trained and active installers. Because many still work on gas boilers, they equal about 4,000 full-time equivalents (FTE), against about 12,000 FTE needed by 2030. MCS's survey found certified businesses employ an average of 4.8 heat pump installers. Our calculation: 2,200 businesses × 4.8 is about 10,560 installers, consistent with the government estimate.43,44
Not every certified company does grant work:
- An estimated 2,666 companies completed at least one MCS-registered heat pump installation in 2022-25.
- 1,875 of them (about 70%) had registered for BUS by March 2025.
- Many of the rest served social housing or new build, or worked mainly in Scotland.
- Registrations surged at launch, with 41% joining in March-July 2022, then grew at about 32 a month.
- Neither the October 2023 grant uplift nor later insulation rule changes noticeably moved registrations.45,46
Funding channels that shape the market
BUS is the core channel, and its design favours air source and scale. MCS estimates BUS funded nearly half of all heat pumps installed in 2025. The flat-rate voucher favours lower-cost systems, and around 97% of scheme installations were air source.47,48
| Channel | Who it reaches | Support | Who directs it | Status, October 2026 |
|---|---|---|---|---|
| Boiler Upgrade Scheme | Existing and self-build homes; not developer new builds or social housing | £7,500 air-to-water or ground source; £2,500 air-to-air; £9,000 for off-gas-grid homes replacing oil or LPG | Installer applies on the owner's behalf | In force; £9,000 rate runs 21 July 2026 to 31 March 2027 |
| ECO4 | Households chosen by obligated energy suppliers | No extra funding in the extension | Energy suppliers | Last version of ECO; ends 31 December 2026 |
| Warm Homes: Social Housing Fund Wave 3 | Social housing rated EPC D to G | £1.3 billion government, matched to over £2.6 billion in delivery; up to £1.65 billion of guaranteed lending | Social landlords | In delivery, with extra funding in 2026/27 |
| Home Energy Scotland Grant and Loan | Scottish homeowners | Up to £7,500 grant plus optional £7,500 interest-free loan for heat pumps; £1,500 rural and island uplift | Homeowner | In force |
| Northern Ireland support scheme | Northern Ireland homes | Not yet set | - | Planned: consultation later in 2026, launch likely in 2027 |
In scheme year 4 (April 2025 to March 2026), Ofgem paid grants worth £233,065,000 for 31,104 systems. That took the total since launch to 80,098 systems. By the October 2026 update, 96,611 vouchers had been redeemed, worth £687,450,500, from 160,874 voucher applications.56,57
Annual BUS spending has risen every year, and £143,585,000 remains for scheme year 5 (April 2026 to March 2027).58
BUS budget spent by year
Source: Ofgem BUS monthly scheme update (13 Oct 2026)
Demand jumped after the £9,000 off-grid grant arrived on 21 July 2026. The following figures are an aggregator's reading of the scheme data:
- July set a record of 8,150 applications.
- August reached 7,486, 120% above August 2025.
- 5,351 of the 15,636 applications in those two months were for the higher grant.
These are applications, not completed installations, and they followed a weak first half. The same aggregator cites a DESNZ business-case budget profile rising from £400 million in 2026/27 to £709 million in 2029/30. That is a plan, not settled allocations.59,60
ECO4 is a significant but closing route. Ofgem's data record 34,004 boiler upgrades to a renewable heating system and 13,586 first-time central heating installations using renewable heating. Both counts cover all renewable heating, not only heat pumps. The Climate Change Committee found ECO funded a similar number of heat pumps to BUS in 2024. The government has decided to close supplier obligations as poor value for money, and the Great British Insulation Scheme ended as planned on 31 March 2026.61,62,63,64
Social-housing funds have so far delivered little heat. Of 65,600 measures under Social Housing Decarbonisation Fund Wave 2.1:
- 52% were insulation.
- 22% were electricity measures such as solar PV.
- 16% were windows and doors.
No heat pump count is given. Kensa told MPs in 2023 that just 3% of the fund's installations had been clean heating.65,66
Scotland's grant-and-loan route is far smaller than BUS. Home Energy Scotland and the private rented sector loan supported 2,224 heat pump installations in 2023-24, and 1,930 in 2024-25 to December 2024.67
Heat pumps installed (HESGL and PRSLL) by year
Source: Scottish Government: Heat pump installation funding and statistics EIR release (20 Feb 2025)
Regional distribution
Southern England dominates. In the first half of 2026 the South East took 18% of retrofits, the South West 14% and the East of England 13%. Only Northern Ireland and London grew; Northern Ireland went from 9 installations to 36.68,69
Jan-Jun 2025 and Jan-Jun 2026 by region
Source: What Heat Pump calculations from DESNZ Table 1.2 (13 Oct 2026)
Wales fell hardest, down 58.2% from 3,152 to 1,318. Scotland fell 28.9% to 2,064, while London rose 28.0% to 1,065.70
In full-year 2025 the South East held 15% of retrofits, the South West 14% and Wales 12%. Over five years London grew fastest, from 96 installations in 2020 to 1,902 in 2025. Wales came next, from 801 to 6,321.71,72
BUS uptake paints Wales differently. Cumulative BUS installations to March 2026 break down as:
- South East 20.0%, South West 18.0%, East of England 13.8%.
- London 5.5%, Wales 5.1%, North East 3.0%.
Adjusted for size, the South West leads with 64.0 paid domestic heat pump grants per 10,000 households (May 2022 to August 2026), and London trails at 14.2. On these inputs, Wales's 12% of 2025 retrofits against its 5.1% of BUS installations means routes other than BUS carry much of the Welsh volume; which routes is not shown. MCS reports that more than 1 in 10 Welsh households have an MCS-certified installation of any technology.73,74,75
Installers cluster where demand is:
- England: MCS-accredited contractors are most numerous in the South East (374) and fewest in the North East (67).
- Scotland: runs its own scheme. MCS reports almost 40,000 installations of all technologies there in 2025, led by Highland, Aberdeenshire and South Lanarkshire.
- Northern Ireland: accounted for 0.02% of UK installations in 2023.78,79,80
Supply-chain links
Most heat pumps are still imported, but UK manufacturing is growing:
- 36% of 2025 heat pump sales were UK-manufactured, and sales of UK-made units rose 38% on 2024.
- The government estimates 30-40% of heat pumps in UK households are made in the UK, and aims for 70%.
- Ideal Heating is scaling its Hull site to 115,000 air source heat pumps and indoor controls a year by 2030.
- Gledhill is set to make 120,000 pre-plumbed hot water cylinders a year in Blackpool.
- Copeland in Northern Ireland received £4.6 million to expand manufacturing of heating compressors, a key heat pump component.81,82,83,84,85
Supply has not been a constraint. Industry stakeholders found the air source supply chain robust, with few delays or shortages in 2022-25, helped by falling sales in mainland Europe. The UK nonetheless remains a net importer. Heat pump models on the UK market rose from 344 in 2019 to 663 in 2024.86,87
Manufacturers court installers directly:
- The government notes major appliance manufacturers offering incentives to installers for heat pump work.
- Under the Clean Heat Market Mechanism, heating appliance manufacturers are penalised for every heat pump not installed as a proportion of their boiler sales. The Energy & Utilities Alliance warns this could cut the training manufacturers give to Gas Safe engineers.
- Octopus is increasing production of its own Cosy heat pumps (Cosy 6, 9 and 12). It owns a pump manufacturer in Portadown, Northern Ireland, formerly Renewable Energy Devices.88,89,90,91
Distributors bundle MCS support with products. Wolseley's Renewables Centre, a partner brand of Plumb Centre, combines accredited training, MCS-certified design, installation support and products. It is backed by Renewable Equipment Solutions, a recent Wolseley acquisition. Bublshop, a nationwide distributor working in the industry since 2013, offers system design and commissioning support plus Hisense and Viessmann training. Members of the Heat Pump Association, which include manufacturers, energy companies and installers, represent around 90% of UK heat pump sales volume.92,93,94,95,96
What the sources gathered do not establish
- Which installers lead UK domestic heat pump installation by name, with verified installation counts for any year.
- How much of the market each installer type delivers: energy-company and utility-linked players, specialist heat pump firms, heating and plumbing contractors, renewables SMEs, and the housebuilder and social-housing channels.
- Air source versus ground source volumes for individual leading installers.
- Heat pump volumes delivered through housebuilders and through installations not certified by MCS.
- Heat pump counts, as distinct from all measures, under the Social Housing Decarbonisation Fund and Warm Homes: Social Housing Fund, and heat pumps under ECO4 separately from other renewable heating.
- Why Wales fell 58% in the first half of 2026, and which funding routes account for its high retrofit share.
- Market shares of the main manufacturers and distributors serving UK installers.
- Full regional and technology detail for the third and fourth quarters of 2025.